PROJECT SUMMARY
Problem: A commercial warehouse located in Newcastle, NSW, previously had rolling filing cabinets that slid back and forth on floor tracks that were utilised to provide capacity storage for documents and paperwork. As the previous tenant had moved out, these cabinets were no longer of use and a solution was required to ensure the new tenants could use all the available floor space.
Solutions: The filing cabinets were removed and 60m² of rail recesses were infilled with
Euclid E3 Flowable.
E3 Flowable was used due to its high flow, high strength development, as well as its ability to handle impact and dynamic loading that is associated with forklift traffic in a commercial warehouse setting.
