FACTORY OR SITE INTUMESCENT COATING APPLICATION | ||||
---|---|---|---|---|
Nullifire SC902 Finish Standard Required |
Location | Finish Required | ||
Internal Steelwork Visible FRL up to 120 minutes C2 |
To Be Confirmed by Client. | |||
Product | Dry Film Thickness (Microns) |
FRL | Thinner Required |
|
Primer Coat | Carboguard 635 | 75 Microns Dry Film Thickness |
N/A | As per TDS |
Intumescent Coat |
Nullifire SC902 | As Per Loading Schedule |
120/--/-- | Carboline #10 100% Xylene |
Compatible Topcoat |
Carbothane 133LH | 75 Microns Dry Film Thickness |
N/A | As per TDS |
Compatible Topcoat |
Carbothane 133LH | 75 Microns Dry Film Thickness |
N/A | As per TDS |
Notes | Level of Finish to be approved by the Architect prior to the start of the project. Topcoat also required if the steelwork is to be left in an open construction phase for longer than 3 months maximum. A Stripe coat of Carboguard 635 at 75 microns dft should be applied over the primer coat to all corners, edges, joints etc. An additional coat of Carbothane 133LH may be required depending upon colour of finish chosen Topcoat thicknesses are minimum requirement. For shop application of Nullifire SC902 the use of Carboquick 200 topcoat will give a more durable finish during transportation and construction. |